Timeline For Project

 There are about 7 weeks until the project is due so here is the timeline I plan on following to get this project done. There are a few days left over in case something goes wrong or I need more time than I thought:


Week 1: (2/3-2/7)

  • Idea Planning
           -Brainstorming
           -Coming up with plot
           -Finding someone to act

Week 2: (2/10-2/14)

  • Production Planning
           -Creating storyboard
           -Costume design
           -Filming locations
           -Music/Font
           

Week 3: (2/17-2/21)

  • Filming
           -Start and finish filming project
           -Compile sound effects and music
  •  Editing
           -Begin editing
           -Experiment with fonts and credits

Week 4: (2/24-2/28)

  • Editing
          -Finish editing

Week 5: (3/3-3/7)

  • Review
         -Revise editing
         -Add finishing touches


Week 6: (3/10-3/14)

  • Creative Critical Reflection
        -Begin CCR

Week 7: (3/17-3/21)

  • Creative Critical Reflection
        -Finish CCR